Home
/
Products
/
Valves & Actuators
/
Control Valves, Regulators & Actuators
/
Control Valve- Ringo
Technical Overview
Verified OEM industrial spare part catalogued for petrochemical & MRO procurement.
Manufacturer:
Valve: Ringo and Positioner: Fisher
Category:
Valves & Actuators
Sub-Category:
Control Valves, Regulators & Actuators
Part Number:
PN-5922
Model Number:
MN-5922
Guaranteed Genuine OEM Industrial Part
Control Valve- Ringo
Part Number
PN-5922
Model Number
MN-5922
Category
Valves & Actuators
Sub-Category
Control Valves, Regulators & Actuators
Product Specification
Item no.:700000136 Ringo Bolted Bonnet Gate Valve NPS3, Class 300 Raised Face Flanges Body/Bonnet : A216 Gr.WCB Wedge/Seat : A216 Gr.WCB + Stellite Actuator : Piston Positioner : Fisher DVC6000 Air Pr...
Availability Status:
In Stock (10 available)
Detailed Specifications & Description
Item no.:700000136
Ringo Bolted Bonnet Gate Valve
NPS3, Class 300
Raised Face Flanges
Body/Bonnet : A216 Gr.WCB
Wedge/Seat : A216 Gr.WCB + Stellite
Actuator : Piston
Positioner : Fisher DVC6000
Air Pressure Regulator : 4708
Max dp : 19.6kg/cm2
Design Pressure : 18.2kg/cm2
Design Temp : 46 deg. C.
Painting: according to RINGO standard procedure. Other procedures available on request
Certification :
- Material Test Certificate EN 10204 3.1 for all pressure retaining parts
- Certificate of Compliance EN 10204 2.1 for balance parts
Non-Destructive Test
- Visual and dimensional inspection.
- Diimensional control of machined parts before assembly
- Dimensional control of complete assembled valves.
- Visual inspection of painting (if applicable).
Pressure Test
Valves shall be tested according to:
- Hydrostatic Body Test according to ASME B16.34 / API 598
- Hydrostatic Seat Test according to ASME B16.34 / API 598
- Functional Test: Open/close at rated pressure.
Documents supplied will include the following :
- Inspection & Test Plan: 4 weeks after Contract Award.
- General Arrangement (GA) Drawings: 4 weeks after Contract Award.
- Manufacturing and Test Procedures, when required by customer: 4 weeks before manufacture.
- Operations & Maintenance Manuals: At time of delivery.
- Final Data Book: At time of delivery.
The final Data Book will include :
- Material Test Certificate EN 10204 3.1 for pressure retaining parts: chemical and mechanical test results.
- Certificate of compliance EN 10204 2.1 for balance materials.
- Certificate of compliance to PED 2014/68 EC for valves whose final destination is an EU country.
- Assembly record, indicating heat numbers of main components.
- Non-Destructive Test certificates, when applicable.
- Hydrostatic Test Reports / certificates.
- Assembly drawings.
- Final Control certificate: including dimensional and painting compliance statement.
- Verifying Authority or customer Inspection Release Notes, when applicable.